Description
The trolley track of the crane must be fixed on the stroke beam, and the trolley track must be fixed on the main beam, when the crane is running and working, the track can not have lateral and longitudinal movement, and the track is easy to adjust
- Qu70 Qu80 Qu100 Qu120
Production Capacity:
101
Delivery Timeframe:
Within 45 Days
Incoterms:
CIF - Cost, Insurance and Freight
DDP - Delivered Duty Paid
EXW - Ex Works
FOB - Free on Board
Packaging Details:
Not informed
More about
Shandong Senlian Metal Technology Ltd
500-1000
Employees
10M - 50M
Sales volume (USD)
30%
% Export sales
Year
Established
Business type
- Industry / Manufacturer
Keywords
- Seamless steel pipe
Contact and location
- Wang Xiaoya
- +86 xxxxxxxx
- 聊城市 / 山东省 | China