Description
Installed in the pipe that connects the expansion tank to the main tank at the top of the transformer, obeying the direction of the arrow is positioned underneath the display.<br />
<br />
The relay is equipped with three valves, one is fixed in the body and serves to drain the oil relay and two that are installed on the lid, one for draining air and that another test that is the valve is in the central part of the lid being used to lock the buoy during transport.<br />
<br />
Once installed, you must remove the valve cap test and thereby releases the buoys that were locked when the relay is completed with oil use the top of the lid by pressing down the shaft. This procedure is to test whether the contacts are working properly.<br />
Discard the lock pin and put the lid back on and check if all the valve caps are tight to prevent leaks.
- Gas Relay Type Buchholz
Production Capacity:
Not informed
Delivery Timeframe:
Not informed
Incoterms:
Not informedPackaging Details:
Not informed
More about
Anilag Ind. & Com. Ltda
50-100
Employees
500K - 1M
Sales volume (USD)
20%
% Export sales
Year
Established
Business type
- Industry / Manufacturer
Keywords
- gauge
- Buchholz Relay
- alívo of pressure valves
- thermometers
- bushings condensivas
Contact and location
- Jose Roberto Galina
- +55 35 xxxxxxxx
- São Gonçalo do Sapucaí / MG | Brazil